USCG Electricity – Question Bank Book 12 (BK12) — page 12
1209 questions with correct answers from the official USCG question bank (2008 edition), book 12 (Engine – USCG question bank, 2008 edition, Engine officers). Pass mark 70%. Click a question to see its answer.
Take the full practice test →Free USCG practice test with the real pass mark, no sign-up- 1101.How many volts are necessary to provide a current of 10 amperes to a motor with an in-line resistance of 11 ohms?
- 1102.A wire is being used as a replacement having twice the length and one-half the cross-sectional area of the original wire. The resistance of this new wire, when compared to that of the original wire, is __________.
- 1103.Chattering of the collector ring brushes on a generator may be remedied by __________.
- 1104.When the current flow in a power transmission line is halved, the power loss __________.
- 1105.An AC circuit has a capacitive reactance of 30 ohms in addition to an inductive reactance of 40 ohms connected in series. What is the reactance of the circuit?
- 1106.A common-emitter circuit has an input voltage of 0.1 volt, an output voltage of 2.0 volts, an input current of 0.5 milliamps, and an output current of 10 milliamps. What is the power gain?
- 1107.An open occurring within the field rheostat of an AC generator can be detected by short circuiting its terminals and observing a __________.
- 1108.A four pole turbo generator is used in conjunction with a 160 pole propulsion motor. If the generator is turning at 3,200 RPM, what is the current speed of the propeller?
- 1109.If the excitation of an alternator operating in parallel is decreased below normal, its __________.
- 1110.Which of the following problems will occur if the circuit breaker of the incoming alternator is closed and it is 180° out of phase with the loaded alternator when paralleling?
- 1111.A loss of field excitation to an AC generator while operating in parallel will cause it to __________.
- 1112.Which of the following statements is true concerning the operation of two alternators in parallel?
- 1113.An alternator switchboard has a synchroscope and synchronizing lamps. If the synchroscope is broken, which of the steps listed is the most essential before an alternator can be paralleled with the bus?
- 1114.According to Coast Guard Regulations (46 CFR), which of the following systems must be arranged so as to be energized by the final emergency power source?
- 1115.Sparking at the brushes of a DC propulsion motor can be the result of __________.
- 1116.When using a megohmmeter to determine which shunt field coil is grounded in a DC machine, you must __________.
- 1117.The most practical method used for resurfacing a ship's main propulsion motor commutator is to __________.
- 1118.Which of the following statements describes the effects of ambient temperature on local action within lead-acid storage batteries?
- 1119.Diesel generators #1 and #2 are operating in parallel at near full load capacity. Diesel generator #1 suddenly trips out mechanically due to low lube oil pressure. The reverse power relay functions properly and trips generator #1 electrically off the board. Which of the following actions should you carry out FIRST?
- 1120.In a 60 Hz AC system, the current will pass through one complete cycle in __________.
- 1121.Three factors responsible for the change in voltage as load is applied to an AC generator are: 1) the drop in resistance in the armature circuit, 2) the change in flux, and 3) the __________.
- 1122.The division of the reactive KVA load between paralleled AC generators is initiated by the __________.
- 1123.Which of the following losses is/are present in every direct current generator armature?
- 1124.Upon failure of the normal power supply, the emergency generator is placed on the line by the __________.
- 1125.The most common type of AC service generator found aboard ship is the stationary __________.
- 1126.The load sharing characteristics of two diesel alternators operating in parallel are directly related to the setting of their governors' __________.
- 1127.Which of the following statements about a three-phase wye connection is correct?
- 1128.Proper storage battery maintenance includes __________.
- 1129.Ambient temperature is the __________.
- 1130.According to Coast Guard Regulations (46 CFR), the talking and calling circuits of a sound powered telephone system must be __________.
- 1131.Which of the spaces listed is defined as a 'location requiring an exceptional degree of protection' when considering the installation of shipboard electrical equipment?
- 1132.The source of emergency lighting and power at loss of normal ship's power on a cargo vessel should be obtained from the __________.
- 1133.Coast Guard Regulations (46 CFR) state that a continuous trickle charge, supplied from the ship's service power system, is required for batteries supplying power to the __________.
- 1134.Coast Guard Regulations (46 CFR) require manual contactors for operating the general emergency alarm on tank vessels to be located in the navigating bridge, engine room and the __________.
- 1135.Coast Guard Regulations (46 CFR) require that lighting fixture globes must be protected by guards if the fixtures are located in the __________.
- 1136.The emergency electrical power source on tank vessels over 500 GT on an international voyage, should be capable of continuous operation under emergency load for __________.
- 1137.Which of the following statements represents the FIRST precaution to be taken prior to working on any installed electrical component?
- 1138.The shipboard general alarm system must receive its main source of power from __________.
- 1139.All electric cables passing through watertight bulkheads must be __________.
- 1140.Which of the following statements concerning electrical cables is correct?
- 1141.From the standpoint of safety, you should never allow salt water to enter a lead-acid storage battery or come in contact with sulfuric acid because __________.
- 1142.Which of the following precautions should be taken when a blown fuse, rated at 10 amperes, is replaced?
- 1143.Before any work on electrical or electronic equipment is performed, which of the following precautions should be carried out?
- 1144.When maintenance personnel are working on electrical equipment, all supply switches should be secured in the open position and tagged specifically by the __________.
- 1145.When changing fuses, you should always __________.
- 1146.Which of the following statements of Coast Guard Regulations (46 CFR Part 111.15) concerning battery installations is correct?
- 1147.According to 46 CFR, which of the following statements is true regarding electric receptacle outlets?
- 1148.Coast Guard Regulations (46 CFR) state that the minimum conductor size allowed for use in flexible electrical cords is __________.
- 1149.Coast Guard Regulations (46 CFR), require that an indicating light at the propulsion control station will operate if overloading or overheating occurs in a __________.
- 1150.Electrical wire in general, when used aboard vessels must meet minimum requirements. Which of the following statements is/are correct?
- 1151.In accordance with Coast Guard Regulations (46 CFR Part 112), each battery operated relay-controlled lantern used for emergency lighting, must __________.
- 1152.Coast Guard Regulations (46 CFR) require that fire door holding and release systems are to comply with subpart __________.
- 1153.Coast Guard Regulations (46 CFR) require that the emergency diesel generator engine shut down when __________.
- 1154.Which of the following is/are true concerning electric power operated watertight door systems?
- 1155.When portable cords are connected to devices such as portable tools, you must eliminate direct tension on the joints or terminal screws. Coast Guard Regulations (46 CFR), allow this to be done by __________.
- 1156.Coast Guard Regulations (46 CFR) require each switchboard to have __________.
- 1157.According to Coast Guard Regulations (46 CFR Part 111), which of the following is an acceptable lining for battery trays containing alkaline batteries?
- 1158.Where automatic restart does not present a hazard after a power failure, Coast Guard Regulations (46 CFR) require motor controllers for auxiliaries vital to the propelling equipment to be provided with __________.
- 1159.According to U. S. Coast Guard Regulations (46 CFR), the motor controller for a submersible electric motor driven bilge pump should be installed __________.
- 1160.Which of the following statements is a requirement of Coast Guard Regulations (46 CFR) concerning emergency diesel generator engines?
- 1161.In accordance with Coast Guard Regulations (46 CFR), a circuit breaker located in the machinery space and installed in a 440V AC system must __________.
- 1162.Which of the following statements is/are true regarding requirements for receptacle outlets aboard vessels?
- 1163.Coast Guard Regulations (46 CFR) require instrument and control wiring in a switchboard to be of what minimum size?
- 1164.Coast Guard Regulations (46 CFR 199) require that each lifesaving appliance, including lifeboat equipment, must be inspected at least once every __________.
- 1165.An emergency generator, driven by an internal combustion engine, shall be tested under load for a minimum of 2 hours at least once every __________.
- 1166.Coast Guard Regulations (46 CFR) require that each alternating current generator arranged for parallel operation shall be provided with __________.
- 1167.According to Coast Guard Regulation (46 CFR) for emergency power and lighting systems, which of the listed items is the only permissible starting aid for the emergency diesel generator engine?
- 1168.When supplying emergency lighting loads, the storage battery initial voltage must not exceed the standard system voltage by more than __________.
- 1169.In accordance with Coast Guard Regulations (46 CFR), a steering gear feeder circuit from the emergency switchboard or alternate power supply must have the capacity for continuous operation of the rudder 15° side to side in not more than 60 seconds for a
- 1170.In accordance with Coast Guard Regulations (46 CFR), the capacity of each branch circuit providing power to a fire detection or alarm system must not be less than what percent of the maximum load?
- 1171.Coast Guard Regulations (46 CFR Part 97.15) require storage batteries to be tested for a specified period of time to demonstrate their ability to properly supply the required emergency load. This test must be performed every __________.
- 1172.Which of the following methods of finish applications is/are considered to be satisfactory for resisting corrosion?
- 1173.When working on a high voltage circuit, you should always have another person present with you. This person should have a good working knowledge of __________.
- 1174.When there is a fire in a large electric motor, normally the very FIRST step is to __________.
- 1175.According to Coast Guard Regulations (46 CFR), which of the following statements is the ONLY method allowed to ease the starting of emergency diesel generator engines?
- 1176.Coast Guard Regulations (46 CFR) require the temporary emergency electrical power source onboard a tank vessel, over 1600 gross tons, and on a coastwise voyage to be able to supply power to each __________.
- 1177.According to Coast Guard Regulations (46 CFR) the capacity of a general emergency alarm system feeder fuse must be at least __________.
- 1178.Corrosion-resistant material' and 'non-corrodible material' will include which of the following __________.
- 1179.Coast Guard Regulations (46 CFR) require the minimum number of ships service generators for ocean vessels to be __________.
- 1180.Coast Guard Regulations (46 CFR Part 111) permit which of the listed types of fuses to be used in an interior lighting circuit?
- 1181.Coast Guard Regulations (46 CFR) require over current protection for steering gear feeder circuits and shall be protected by __________.
- 1182.Coast Guard Regulations (46 CFR Part 111.70) require which of the listed features to open the power circuit to a motor due to low voltage and re-close when the voltage is restored to normal?
- 1183.In accordance with Coast Guard Regulations (46 CFR), 'corrosive location' means a/an __________.
- 1184.In accordance with Coast Guard Regulations (46 CFR), each diesel engine driven generator prime mover must have an overspeed device, independent of the normal operating governor, and adjusted so that the speed cannot exceed the maximum rated speed by more than __________.
- 1185.Which of the following devices for a lifeboat winch electrical circuit automatically prevents the davit arms of a gravity-type unit from over traveling their tracks when raising the lifeboat?
- 1186.Coast Guard Regulations (46 CFR) require that automatic transfer to the emergency diesel generator(s) assume loads as soon as __________.
- 1187.Which of the following statements, regarding Coast Guard Regulations (46 CFR), is correct concerning electric engine order telegraphs?
- 1188.When power ventilation is required in a battery compartment, Coast Guard Regulations (46 CFR) require __________.
- 1189.In accordance with Coast Guard Regulations (46 CFR), the emergency generator set aboard an 1800 GT tank ship in ocean service, must be capable of supplying an emergency source of power for a minimum period of __________.
- 1190.Coast Guard Regulations (46 CFR Part 111) state that transformer windings must be resistant to __________.
- 1191.If a steering motor becomes overloaded, the __________.
- 1192.Coast Guard Regulations (46 CFR) require that the construction and operation of ship's service generators adhere to the codes of the __________.
- 1193.To comply with Coast Guard Regulations (46 CFR), a permanently grounded conductor must not have an over current device unless the over current device simultaneously opens each ungrounded conductor of the __________.
- 1194.Coast Guard Regulations (46 CFR) prohibit the use of portable electric cord or fixture wire aboard ship if that wire or cord is smaller than __________.
- 1195.Coast Guard Regulations (46 CFR) requires that each electrical receptacle is to have a grounding pole, but only if it __________.
- 1196.According to Coast Guard Regulations (46 CFR Part 111), which of the following is true concerning flexible electric cord and cable used aboard ship?
- 1197.In accordance with Coast Guard Regulations (46 CFR), receptacles for refrigerated containers must __________.
- 1198.Coast Guard Regulations (46 CFR) require that the emergency lighting and power system __________.
- 1199.Coast Guard Regulations (46 CFR Part 120) state that a normal source for emergency loads and power on a cargo vessel must be supplied from __________.
- 1200.A storage battery for an emergency lighting and power system must have the capacity to __________.