Before any work on electrical or electronic equipment is performed, which of the following precautions should be carried out?

  1. ADe-energize the applicable switchboard bus.
  2. BBypass the interlocks.
  3. CSecure and tag the supply circuit breaker in the open position. ✓
  4. DStation a man at the circuit supply switch.

Correct answer: C) Secure and tag the supply circuit breaker in the open position.

USCG question bank (2008) · Electricity – Question Bank Book 12 · pass mark 70%