Coast Guard Regulations (46 CFR) require that the emergency lighting and power system __________.
- Aemergency generator must be tested under load before sailing
- Bmust be tested and inspected weekly and the date recorded ✓
- Cbatteries must be tested annually and the date recorded
- Dmust be capable of sustaining the emergency load for 48 hours
Correct answer: B) must be tested and inspected weekly and the date recorded