USCG Deck Safety – Question Bank Book 4 (BK4) — page 45
4852 questions with correct answers from the official USCG question bank (2008 edition), book 4. Pass mark 70%. Click a question to see its answer.
Take the full practice test →Free USCG practice test with the real pass mark, no sign-up- 4401.After putting on a self-contained breathing apparatus, you open the air supply and hear a continuous ringing of a bell. What does this mean?
- 4402.When the bypass valve of a self-contained breathing device is opened, the air flows __________.
- 4403.When the mainline valve of a self-contained breathing apparatus is open, the bypass valve should be __________.
- 4404.What is the chief advantage of an SCR or AC-DC system over a straight DC system for powering drilling rig machinery?
- 4405.In case of damage to the DEEP DRILLER on location, the immediate objective is to reduce the unexpected inclination and return the unit to __________.
- 4406.When the wave period and the apparent rolling period of the MODU are the same __________.
- 4407.At an angle of loll, the righting moment is __________.
- 4408.An "on-load" release system on a survival craft means the cable can be released __________.
- 4409.The "off-load" release system on a survival craft is designed to be activated __________.
- 4410.At a speed of 6 knots the fuel aboard a survival craft should last __________.
- 4411.When inspecting a survival craft, you should check to make sure that the __________.
- 4412.When drilling from a MODU the weight in air of tubular goods on the racks is reduced when run into the drilled hole because of the effect of __________.
- 4413.Cartridge-operated dry chemical extinguishers used on MODU's should have the propellant cartridge weighed every __________.
- 4414.It is proposed to moor the DEEP DRILLER in 600 feet of water in a region in which the effective wind velocity could reach 80 knots, significant wave height could reach 30 feet, and the current could be 1.5 knots. If these conditions occurred at the same time from the beam, the total environmental force would be __________.
- 4415.A person who holds a foreign license can serve as the ballast control operator to meet manning requirements on a MODU on waters outside U.S. jurisdiction until the __________.
- 4416.A semisubmersible is more likely to experience structural stresses during heavy weather when __________.
- 4417.Progressive flooding on a MODU is controlled by securing watertight boundaries and __________.
- 4418.What additional precautions should be taken when making temporary repairs to a MODU that is operating when hydrogen sulfide is present?
- 4419.When preparing a MODU for heavy weather, fuel oil day tanks should be __________.
- 4420.What is the displacement of the DEEP DRILLER with a draft of 19.5 feet in fresh water?
- 4421.The COASTAL DRILLER, elevated in 200 feet of water, has two knots of current and 70 knot winds. With a maximum leg reaction of 5,840 kips, the maximum wave height for drilling is __________.
- 4422.What is the port leg reaction for the COASTAL DRILLER if the total weight is 15,000 kips, LCG is 120 feet, and TCG is 1.0?
- 4423.What is the minimum required GML for the DEEP DRILLER in winds less than 70 knots while at a draft of 60 feet?
- 4424.When two ballast pumps used for deballasting a single tank start cavitating, you should __________.
- 4425.While in transit, the DEEP DRILLER suffers flooding in the port pump room. Both port bilge pumps are inadequate to dewater the pump room. You may supplement the bilge pumps by using the __________.
- 4426.Most medium and slow speed diesels are started by what medium?
- 4427.While at operating draft, the DEEP DRILLER suffers flooding in the port pump room. Both port bilge pumps are inadequate to dewater the pump room. You may supplement the bilge pumps with the __________.
- 4428.To effectively use the crossover system on the DEEP DRILLER to pump from the low side using a high side ballast pump, transverse inclinations should not exceed __________.
- 4429.While in transit, the DEEP DRILLER suffers flooding in the starboard pump room. Both starboard bilge pumps are inadequate to dewater the pump room. You may supplement the performance of the bilge pumps by using the __________.
- 4430.The COASTAL DRILLER is loaded as shown in Sample Load Form #3 (Drilling). What would be the new sum of longitudinal moments for the liquid variables if the entire contents of drill water tank #17 are transferred to drill water tank #18?
- 4431.The DEEP DRILLER has a KGL of 53.16 feet while at a draft of 58.0 feet. Although there are no environmental forces, trim is 2.0 feet by the stern. What is the value of LCG?
- 4432.Laying down drill pipe from the derrick of a semisubmersible on location reduces the __________.
- 4433.The DEEP DRILLER, at a draft of 60 feet and a total vertical moment of 1,012,598 foot-tons, pumps 2,068.7 long tons of ballast overboard. The VCG of the discharged ballast is 15.0 feet. What is the new height of the center of gravity?
- 4434.Category 1 EPIRBs are required to be carried on board __________.
- 4435.A moment of 300 ft-tons is created by a force of 15,000 tons. What is the moment arm?
- 4436.A semisubmersible, displacing 20,500 long tons, has vertical moments of 1,060,000 foot-long tons. What is the change in KG if 500 long tons are discharged from a VCG of 120 feet?
- 4437.The ship's drawings for use when the DEEP DRILLER is damaged are available in the __________.
- 4438.The DEEP DRILLER, loaded as shown in Sample Load Form #2 (Ballast to Survival), suffers major damage which results in flooding in tank 1S. Your best countermeasure is to __________.
- 4439.The DEEP DRILLER, loaded as shown in Sample Load Form #2 (Ballast to Survival), suffers major damage which results in flooding in tank 10S. Your best countermeasure is to __________.
- 4440.The DEEP DRILLER, loaded as shown in Sample Load Form #2 (Ballast to Survival), suffers major damage which results in flooding in tank C3S. Pumping from tanks in the vicinity of the damage have proven ineffective. Your best countermeasure is to __________.
- 4441.When elevating the COASTAL DRILLER in 100 feet of water, the unit should be placed at an air gap of __________.
- 4442.When elevating the COASTAL DRILLER in 150 feet of water, the unit should be placed at an air gap of __________.
- 4443.When elevating the COASTAL DRILLER in 200 feet of water, the unit should be placed at an air gap of __________.
- 4444.When the COASTAL DRILLER is afloat, the water for the saltwater eductor system is provided by __________.
- 4445.When extracting the legs from the soil, the hull of the COASTAL DRILLER may be pulled down until the draft is __________.
- 4446.What is an advantage of diesel over steam turbine propulsion?
- 4447.When the COASTAL DRILLER is elevated, the water for the saltwater eductor system is provided by __________.
- 4448.Your drafts are: FWD 16'-02", AFT 20'-08". Use the blue pages of the Stability Data Reference Book to determine the MT1.
- 4449.The maximum variable load for the COASTAL DRILLER while elevated in a severe storm is __________.
- 4450.During a severe storm while the COASTAL DRILLER is elevated, on board loads must be shifted so that the TCG is on the centerline and the LCG is __________.
- 4451.In a severe storm while elevated, the drilling loads on the COASTAL DRILLER must be considered as __________.
- 4452.The COASTAL DRILLER, while in transit, expects the winds to increase to 75 knots. In order to meet the stability and leg strength requirements, the tip-of-can (TOC) position should be at __________.
- 4453.On a vessel of 6500 tons displacement, a tank 30 ft. long, 32 ft. wide and 15 ft. deep is half filled with oil cargo (S.G. 0.948) while the vessel is floating in saltwater (S.G. 1.026). What is the free surface constant for this tank?
- 4454.While on an ocean tow, the COASTAL DRILLER is threatened with the approach of a severe storm. Including the time required to place the generators on-line, the approximate time required to lower the legs from a TOC (tip-of-can) position of 12.38 feet to 60.5 feet is __________.
- 4455.While on a normal tow, the COASTAL DRILLER is threatened with the approach of a severe storm. Including the time required to place the generators on-line, the approximate time required to lower the legs from a TOC (tip-of-can) position of 1.20 feet to 60.50 feet is __________.
- 4456.While on an ocean tow, the COASTAL DRILLER is threatened with the approach of a severe storm. The legs should be lowered so that the TOC (tip-of-can) is lowered from 12.38 feet to __________.
- 4457.While on a normal tow, the COASTAL DRILLER is threatened with the approach of a severe storm. The legs should be lowered so that the TOC (tip-of-can) is lowered from 1.20 feet to __________.
- 4458.When preloading the COASTAL DRILLER, the minimum total weight shall not be less than __________.
- 4459.What fitting should you install in the rig piping to a pump to facilitate disconnecting the pump for servicing?
- 4460.In the piping systems of a MODU, what type of valve gives the least resistance to fluid flow when fully open?
- 4461.What is the purpose of a striker plate?
- 4462.What is the purpose of a vent header?
- 4463.Which will improve stability?
- 4464.What is the purpose of a check valve?
- 4465.On what type of pump would you find an impeller?
- 4466.What is the proper direction of flow through a globe valve when the valve is installed to be in a normally open position?
- 4467.When taking soundings on a floating MODU, the tape should be lowered and brought back quickly to __________.
- 4468.When taking soundings on a MODU, coating the tape with chalk helps to __________.
- 4469.When removing the cap from a sounding tube on a MODU, the sound of air escaping indicates the tank __________.
- 4470.In a wire rope mooring system, the fairlead sheave should be a minimum of __________.
- 4471.An effective braking system for windlasses on rigs in deep water is a(n) __________.
- 4472.In storm conditions, when the DEEP DRILLER is in 600 feet water depth, and the high-line tension (HLT) is 350 kips, completely slacking the two leeward mooring line tensions reduces the HLT to __________.
- 4473.When the alarm bell sounds on a positive-pressure, self-contained breathing apparatus, how long will reserve air supply last?
- 4474.The bypass valve on a self-contained breathing device should be opened if __________.
- 4475.Automatic mechanical ventilation shutdown is required for CO2 systems protecting the __________.
- 4476.What is NOT used as a stern tube bearing, on a large vessel?
- 4477.Failure of both port-side ballast pumps on the DEEP DRILLER prevents their use. To dewater from the port forward tanks, you should use the __________.
- 4478.The DEEP DRILLER suffers minor flooding of the port pump room. If both port bilge pumps fail to dewater the pump room, you should use the __________.
- 4479.The DEEP DRILLER suffers minor flooding of the starboard pump room. If both starboard bilge pumps fail to dewater the pump room, you should use the __________.
- 4480.On a MODU, if there is a probability of encountering H2S during the drilling of a well, air movers (bug blowers) should be installed to dilute concentration of H2S at the __________.
- 4481.Since accumulations of H2S gas on a MODU can be dangerous to personnel, it is important to know that H2S gas is __________.
- 4482.The sense of smell cannot be depended upon to detect H2S because __________.
- 4483.High concentrations of H2S gas are most dangerous to personnel because they can __________.
- 4484.The worst atmospheric condition for dispersion of H2S is __________.
- 4485.The airborne concentrations of substances (such as H2S) under which nearly all workers may be repeatedly exposed without adverse effects are called __________.
- 4486.The minimum concentration of H2S which can cause death if a person is exposed for even an instant is __________.
- 4487.The maximum concentration of H2S to which workers may be regularly exposed without adverse effects is __________.
- 4488.The Lethal Concentration of H2S that will cause death with short-term exposure is a minimum of __________.
- 4489.If H2S exposure is anticipated, fixed monitoring devices aboard a MODU should have a low level concentration alarm to alert personnel when H2S concentrations first reach a maximum of __________.
- 4490.When H2S has been encountered on a MODU, or is anticipated, monitoring devices must sound an alarm (which differs from the lower concentration alarm) or otherwise warn employees when concentration of H2S reaches or exceeds how many parts per million?
- 4491.When H2S is burned (flared) on a MODU, what can you expect to occur?
- 4492.What type of stern tube bearing has the least friction?
- 4493.Individuals who have consumed alcohol within 24 hours of exposure to H2S can tolerate __________.
- 4494.Requirements for H2S preparation and equipment usage aboard MODU's in U.S. offshore waters are administered by the __________.
- 4495.What is the percentage of oxygen in a typical sample of uncontaminated air?
- 4496.Clean air standards referred to as "Grade D" apply to compressed air for use in __________.
- 4497.The probability of sulfide stress cracking in the presence of hydrogen sulfide is greatest for __________.
- 4498.For H2S detection, sensitized tapes indicate H2S presence by means of discoloration of an exposed spot on the tape. The shade of the color on the spot depends upon the concentration of H2S and __________.
- 4499.All diesel engines are classified as __________.
- 4500.What is a pinion in a jacking system?