Take the full practice test →Free USCG practice test with the real pass mark, no sign-up- 3801.A MODU with the TCG off the longitudinal centerline inclines to an angle of __________.
- 3802.When a floating MODU inclines to an angle slightly greater than the angle of loll, she will __________.
- 3803.A semisubmersible floating in sea water displaces 20,000 long tons. She has vertical moments of 1,000,000 foot-long tons. What is the change in KG if 500 long tons are placed aboard at a KG of 120 feet?
- 3804.A MODU displacing 10,000 long tons with KG 20.0 feet, uses its crane to lift a 40 long ton load from dockside and place it on board at a VCG of 5.0 feet. When lifting, the head of the crane boom is 50.0 feet above the keel. During the lift, what is the apparent increase in KG?
- 3805.Your non-oceangoing vessel is required to have a fixed piping system to discharge oily mixtures ashore. What is required at each outlet of this system?
- 3806.A MODU displacing 10,000 tons uses its crane to lift a 20 ton load, already aboard, to a height of 5 feet above the deck. When lifting, the head of the crane boom is 50 feet above the load. What is the change in KG?
- 3807.The DEEP DRILLER, in transit at a seawater draft of 19 feet, enters a fresh water port. What is the new draft?
- 3808.The DEEP DRILLER departs a fresh water port at a draft of 20 feet. What will be the draft in sea water?
- 3809.The DEEP DRILLER departs a fresh water port at a draft of 19.5 feet. What will be the draft in sea water?
- 3810.The DEEP DRILLER departs a fresh water port at a draft of 20.5 feet. What will be the draft in sea water?
- 3811.While being towed at a 19.5 foot draft, the DEEP DRILLER experiences single amplitude pitching of 7.5 degrees with an 8 second period. You should __________.
- 3812.The DEEP DRILLER is being towed at a 20 foot draft. Vessel motions are within acceptable limits, but the waves begin to hit the horizontal braces. You should __________.
- 3813.The DEEP DRILLER is under tow at a 20 foot draft. The rig motions are close to exceeding the limits for critical pitch and roll. The rig is also experiencing occasional pounding on the horizontal braces. In this situation you should __________.
- 3814.You are hoisting a heavy lift with the jumbo boom. Your vessel displaces 8560 T. The 45-ton weight is on the pier and its center is 65' to starboard of the centerline. The head of the boom is 95' above the base line and the center of gravity of the lift when stowed on deck will be 55' above the base line. As the jumbo boom takes the strain the ship lists to 5.5°. What is the GM with the cargo stowed?
- 3815.The DEEP DRILLER, at a draft of 60 feet, has VM of 942,120 ft-tons, and FSML of 36,235 ft-tons. What is the KGL?
- 3816.If the low side bilge pump fails and the high side bilge pump has insufficient suction to dewater the low side of the COASTAL DRILLER when afloat, you should use the __________.
- 3817.Among the possible causes of unexpected rapid increasing inclination of the floating COASTAL DRILLER is __________.
- 3818.Among the possible causes of unexpected constant inclination of the floating COASTAL DRILLER is __________.
- 3819.When floating, the appropriate leg horizontal must be aligned in the center of the __________.
- 3820.If the cause of a sudden severe list or trim is negative initial stability, counterflooding into empty tanks may __________.
- 3821.During counterflooding to correct a severe list or trim aggravated by an off-center load, a MODU suddenly takes a list or trim to the opposite side. You should __________.
- 3822.If a MODU takes a sudden severe list or trim from an unknown cause, you should FIRST __________.
- 3823.To maintain a high state of readiness against the possibility of damage and subsequent flooding while aboard the DEEP DRILLER, you should __________.
- 3824.In case of major damage to column C1P while the DEEP DRILLER is on location, you should pump from port-forward lower-hull tanks using __________.
- 3825.The DEEP DRILLER, loaded as shown in Sample Load Form #4 (Drilling), suffers major damage which results in flooding in tank C1P. Your best countermeasure is to __________.
- 3826.The DEEP DRILLER, loaded as shown in Sample Load Form #4 (Drilling), suffers major damage which results in flooding in tank C3S. Your best countermeasure is to __________.
- 3827.The DEEP DRILLER, loaded as shown in Sample Load Form #4 (Drilling), suffers major damage which results in flooding in tank C1P. Pumping from tanks in the vicinity of the damage has proven ineffective. Your best countermeasure is to __________.
- 3828.The DEEP DRILLER, loaded as shown in Sample Load Form #4 (Drilling), suffers major damage which results in flooding in tank C3S. Pumping from tanks in the vicinity of the damage have proven ineffective. Your best countermeasure is to __________.
- 3829.The DEEP DRILLER, loaded as shown in Sample Load Form #5 (Survival), suffers major damage which results in flooding in tank C1P. Your best countermeasure is to pump from __________.
- 3830.The DEEP DRILLER, loaded as shown in Sample Load Form #5 (Survival), suffers major damage which results in flooding in tank C3S. Your best countermeasure is to __________.
- 3831.In case of minor damage to lower-hull tank 1P while the DEEP DRILLER is in transit, you should pump from tank 1P using __________.
- 3832.The SS AMERICAN MARINER has drafts of: FWD 18'-07", AFT 23'-03". Use the white pages of the Stability Data Reference Book to determine the drafts if you ballast the forepeak with 92 tons of seawater.
- 3833.Failure of both port ballast pumps on the DEEP DRILLER prevents their use. To deballast from tank 1P, you may use the __________.
- 3834.The DEEP DRILLER suffers minor flooding of the port pump room while in transit. If both port bilge pumps fail to dewater the pump room, you may __________.
- 3835.The DEEP DRILLER suffers minor flooding of the starboard pump room while in transit. If both starboard bilge pumps fail to dewater the pump room, you may use __________.
- 3836.The DEEP DRILLER, loaded as shown in Sample Load Form #1 (Transit), suffers minor damage which results in flooding in tank 1P. You may pump from __________.
- 3837.A vessel is inclined at an angle of loll. In the absence of external forces, the righting arm (GZ) is __________.
- 3838.The DEEP DRILLER, loaded as shown in Sample Load Form #1 (Transit), suffers minor damage which results in flooding in tank 1S. You may pump from __________.
- 3839.Among the possible causes of unexpected rapidly increasing inclination of the DEEP DRILLER while in transit is __________.
- 3840.The COASTAL DRILLER, in ocean transit at a draft of 10 feet 6 inches with winds less than 70 knots, has a KGT of 50.6 feet and a KGL of 51.4 feet. The margin on the maximum allowable KG is __________.
- 3841.The COASTAL DRILLER, in ocean transit at a draft of 10 feet 6 inches with winds greater than 70 knots, has a KGT of 38.7 feet and a KGL of 38.2 feet. The margin on the maximum allowable KG is __________.
- 3842.Your drafts are: FWD 17'-09", AFT 21'-03". What is the KM based on the tables in the blue pages of the Stability Data Reference Book?
- 3843.The COASTAL DRILLER, in field transit at a draft of 10 feet 0 inches with winds less than 70 knots, has a KGT of 39.0 feet and a KGL of 38.6 feet. The margin on the maximum allowable KG is __________.
- 3844.The COASTAL DRILLER, in ocean transit at a draft of 10 feet 0 inches with winds greater than 70 knots, has a KGT of 39.0 feet and a KGL of 38.6 feet. The margin on the maximum allowable KG is __________.
- 3845.The COASTAL DRILLER, in transit during a severe storm while at a draft of 9 feet 6 inches, has a KGT of 39.1 feet and a KGL of 39.9 feet. The margin on the maximum allowable KG is __________.
- 3846.While the COASTAL DRILLER is in transit at a draft of 10 feet 6 inches, a severe storm is predicted within 12 hours. VM are 541,257 ft-kips, FSML are 32,000 ft-kips and FSMT are 24,000 ft-kips. How much should the KGL be lowered to satisfy the maximum allowable KG criteria?
- 3847.While the COASTAL DRILLER is in transit at a draft of 10 feet 6 inches, a severe storm is predicted within 12 hours. VM are 520,462 ft-kips, FSML are 26,000 ft-kips, and FSMT are 25,000 ft-kips. How much should the KG corrected for free surface effects be lowered to satisfy the maximum allowable KG criteria?
- 3848.While the COASTAL DRILLER is in transit at a draft of 10 feet 6 inches, a severe storm is predicted within 12 hours. VM are 546,462 ft-kips, FSML are 18,000 ft-kips, and FSMT are 32,000 ft-kips. How much should the KG corrected for free surface effects be lowered to satisfy the maximum allowable KG criteria?
- 3849.While the COASTAL DRILLER is in transit at a draft of 10 feet 6 inches, a severe storm is predicted within 12 hours. GMT is 98.89 feet. How much should the KG corrected for free surface effects be lowered to satisfy the maximum allowable KG criteria?
- 3850.For stronger leg support when the COASTAL DRILLER is elevated, locate a set of horizontal leg braces as near as possible to the __________.
- 3851.When preloading the COASTAL DRILLER, the maximum total weight shall not exceed __________.
- 3852.You are scheduled to load 3200 tons of cargo, 45 tons of crew effects and stores and 323 tons of fuel. Use the blue pages of the Stability Data Reference Book to determine the vessel's mean draft in salt water.
- 3853.During preloading or elevating the COASTAL DRILLER, jacking-up may continue if the total weight is less than __________.
- 3854.The COASTAL DRILLER, when underway was loaded as shown in Sample Load Form #1 (Rig Move). It is now preloaded at minimum air gap waiting for all settling to take place. The preload, weighing 7,191.7 kips, has LM 870,196 ft-kips and TM 2,158 ft-kips. What is the bow leg reaction?
- 3855.The COASTAL DRILLER, when underway was loaded as shown in Sample Load Form #1 (Rig Move). It is now preloaded at minimum air gap waiting for all settling to take place. The preload, weighing 7,191.7 kips, has LM 870,196 ft-kips and TM 2,158 ft-kips. What is the starboard leg reaction?
- 3856.The COASTAL DRILLER, when underway was loaded as shown in Sample Load Form #1 (Rig Move). It is now preloaded at minimum air gap waiting for all settling to take place. The preload, weighing 7,191.7 kips, has LM 870,196 ft-kips and TM 2,158 ft-kips. What is the port leg reaction?
- 3857.While preloading, the COASTAL DRILLER has a total weight of 21,401 kips. The LM are 2,560,416 ft-kips, and the TM are -6,206 ft-kips. What is the port leg reaction?
- 3858.While preparing for a storm when elevated, the total weight of the COASTAL DRILLER is 14,150 kips, LM are 1,712,150 ft-kips, and TM are -9,905 ft-kips. The bow leg reaction is __________.
- 3859.While preloading, the COASTAL DRILLER has a total weight of 21,401 kips. The LM are 2,560,416 ft-kips, and the TM are -6,206 ft-kips. What is the starboard leg reaction?
- 3860.The most likely location for a liquid cargo fire to occur on a tanker would be __________.
- 3861.Small passenger vessels in coastwise service must carry approved __________.
- 3862.It is vital to the safety of the elevated COASTAL DRILLER that the hull be kept above __________.
- 3863.You are hoisting a heavy lift with the jumbo boom. Your vessel displaces 5230 T. The 35-ton weight is on the pier and its center is 60' to starboard of the centerline. The head of the boom is 105' above the base line and the center of gravity of the lift when stowed on deck will be 42' above the base line. As the jumbo boom takes the strain the ship lists to 5°. What is the GM with the cargo stowed?
- 3864.The COASTAL DRILLER is operating with a wave clearance of about 20 feet. The out-of-level alarm sounds and the unit is found to be inclined 0.5 degree bow down. The recommended course of action is to __________.
- 3865.The COASTAL DRILLER has suffered a casualty which requires an orderly evacuation of the unit using the lifeboats and liferafts. Among the items to accomplish in preparing to evacuate the unit is __________.
- 3866.While drilling loaded as shown in Sample Load Form #4 (Drilling), the DEEP DRILLER suffers a sudden unexpected inclination to port and forward. Strong wind and high waves are from the starboard quarter. Among the possible causes, you should consider __________.
- 3867.While drilling loaded as shown in Sample Load Form #4 (Drilling), the DEEP DRILLER suffers a sudden unexpected inclination to starboard and forward. Strong winds and high waves are from the port quarter. Among the possible causes, you should consider __________.
- 3868.While drilling loaded as shown in Sample Load Form #4 (Drilling), the DEEP DRILLER suffers a sudden unexpected inclination to starboard and aft. Strong wind and high waves are on the port bow. Among the possible causes, you should consider __________.
- 3869.What percentage of the breaking strength is the generally accepted safe operating load of an anchor cable?
- 3870.The only wire rope termination which may be made in the field is __________.
- 3871.Thirty-five percent of the breaking strength of an anchor cable is generally accepted as the __________.
- 3872.A common class of wire rope used for mooring is the 6x19 class. What does the 6 represent?
- 3873.A common class of wire rope used for mooring is the 6x37 class. What does the 37 represent?
- 3874.What is an advantage of the 6x19 class of wire rope over the 6x37 class of wire rope of the same diameter?
- 3875.What is an advantage of the 6x37 class of wire rope over the 6x19 class of wire rope of the same diameter?
- 3876.Where do fatigue failures of wire rope mooring lines usually occur?
- 3877.The primary purpose for using stud link chain in a mooring system on a rig is the __________.
- 3878.Standards for fabrication and testing of chain on mobile offshore drilling units are provided by the __________.
- 3879.The purpose of the inclining experiment on a vessel is to determine the __________.
- 3880.A common means of connecting shots of anchor chain in the field is to use a __________.
- 3881.The idler sheave which directs and turns the anchor cable from a semisubmersible is known as the __________.
- 3882.The maximum angular tolerance for a bent link of an anchor chain is __________.
- 3883.A measurement device for inspecting anchor chain is the __________.
- 3884.The American Petroleum Institute recommends that a new anchor chain should be inspected after being in service for __________.
- 3885.The American Petroleum Institute recommends that connecting links and anchor shackles be inspected using __________.
- 3886.Extended cyclical variations in tensions will cause an anchor chain to break due to __________.
- 3887.Which grade of anchor chain is generally used on floating drilling vessels?
- 3888.What is a major disadvantage of Di-Lok chain compared with Oil Rig Quality (stud link) chain in floating drilling rig operations?
- 3889.What are the two main types of stud link chain?
- 3890.While signaling by flashing light you make an error. You should send __________.
- 3891.Which problem is virtually impossible to detect during an in-service inspection of used mooring chain?
- 3892.The SS AMERICAN MARINER has drafts of: FWD 13'-05", AFT 21'-03". Use the white pages of the Stability Data Reference Book to determine the drafts if you ballast the forepeak with 88 tons of seawater.
- 3893.The American Petroleum Institute recommends magnetic particle inspection for __________.
- 3894.Your drafts are: FWD 17'-09", AFT 18'-03". What is the KM based on the tables in the blue pages of the Stability Data Reference Book?
- 3895.When inspecting anchor chain, the American Petroleum Institute recommends checking the length over 5 links every __________.
- 3896.A link on an anchor chain should be replaced when wear or grinding of surface cracks has reduced the cross section area by __________.
- 3897.What should be done after repairing a surface crack on a link of anchor chain by grinding?
- 3898.Grinding to eliminate shallow surface defects should be done __________.
- 3899.Prior to magnetic particle inspection of anchor chain, the chain should be __________.
- 3900.Before being certified by the American Bureau of Shipping, anchor chain must undergo __________.