While at operating draft, the DEEP DRILLER suffers flooding in the port pump room. Both port bilge pumps are inadequate to dewater the pump room. You may supplement the bilge pumps with the __________.

  1. Astarboard ballast pump and crossover system
  2. Bport ballast pump
  3. Cport saltwater service pump
  4. Dport drill water pump ✓

Correct answer: D) port drill water pump