While on a normal tow, the COASTAL DRILLER is threatened with the approach of a severe storm. Including the time required to place the generators on-line, the approximate time required to lower the legs from a TOC (tip-of-can) position of 1.20 feet to 60.50 feet is __________.
- A8 minutes
- B32 minutes
- C47 minutes
- D55 minutes ✓
Correct answer: D) 55 minutes