F1 Electrical, electronic and control engineering — ETO (CMKE, Poland) — Page 5
586 questions with correct answers. Click a question to see its answer.
Take the full test →Random exam test generator, free, no registration- 401.Positioner:
- 402.The calibration of the positioner is based on which of the following?
- 403.What does symbol LIAHL denote?
- 404.If the power unit is controlled by the navigator, the mechanic
- 405.Presented symbol denotes that the directional valve (control valve) is
- 406.Presented symbol of the directional valve (control valve) regards
- 407.Signal CRITICAL RPM LIMIT appears when
- 408.System Combinator regards which of the following?
- 409.In power unit with the adjustable blade propeller the SLD (Slow Down) function is most often implemented by which of the following?
- 410.Application of the adjustable blade propeller enables which of the following?
- 411.Decreased fuel consumption for a set speed of the ship can be obtained by which of the following?
- 412.The Combinator system ensures optimal operation of the power unit of the unit:
- 413.Turning on the shaft generator in most systems:
- 414.An isolated system of generation and distribution of electricity denotes
- 415.In the fixed conditions, the voltage of the ship power installation at loads of alternating current generators from idle to the rated power rate and at the nominal power rate should be the maintained at the level of which of the following?
- 416.In the fixed conditions, the frequency of the ship installation at the loading between 0 and 100% of the rated loading of generators should be maintained at the level of which of the following?
- 417.In the dynamic conditions in the ship installation, when the loading of the alternating current generator changes rapidly (turning on, turning off the loading at the level of 60% the rated current at cosΦ<0.4ind.) operating with the rated voltage should be within which of the following?
- 418.In dynamic conditions, when the loading of the rated loading of the current is fully disconnected, the frequency of the generator current in the ship power installation should not exceed
- 419.The voltage adjustment time to reach the level Un ± 3% Un after a surge in the load of the unit (60% Jn, cos φ<0.4ind.) should not exceed
- 420.The frequency adjustment time to reach level ± 1% fn after a surge in the load of the unit ( 50% Pn) should not exceed
- 421.The following directly control frequency values in the ship installation:
- 422.The following directly control voltage in the ship installation:
- 423.The static mechanic characteristic of the generator motor with the speed governor n = f(P) when the generator unit is planned to work together in parallel with another unit should:
- 424.The horizontal characteristics n=f(P) of the engine with the “speed droop” knob is set to which of the following?
- 425.The necessary condition of the automatic fuel distribution to units operating in parallel (the active power) is which of the following?
- 426.The necessary condition of the proportionate fuel distribution (the active power) to units operating in parallel is which of the following?
- 427.After the electrical loading to the power plant where two unites operate whose speed governors stabilize r.p.m. from SPD1>0, SPD2>0 is connected, the frequency in the steady state
- 428.When the power is proportionately distributed between units operating in parallel, the deviation from the proportional loading should not be greater than which of the following?
- 429.The speed governor is most often
- 430.The reactive power is distributed to generators working in parallel by which of the following?
- 431.When the reactive power is proportionately distributed between generators operating in parallel, the deviation from the proportional loading by the reactive power should not be greater than which of the following?
- 432.Uneven loading of units operating in parallel over time after connection to the electricity receivers is caused most often:
- 433.The Mayer switch performs the following tasks:
- 434.The backup electricity source should be able to take over the loading after power failure of the basic energy source no later than
- 435.In the process of controlling the fuel viscosity, which of the following is true?
- 436.Controlling fuel viscosity is applied in the case of which of the following?
- 437.In which device of the computer alarm system is the alarm detected?
- 438.What is the function of the sensor in the system?
- 439.If the marine power plant is unmanned, the alarms are signalled:
- 440.The alarm can be acknowledged from which of the following?
- 441.What is the minimum equipment of the operator station?
- 442.When is the alarm signalled?
- 443.The binary parameter can have the following values:
- 444.When may the operator change the limit value of the parameter?
- 445.The trend function shows
- 446.In which devices are the control algorithms for specific subsystems applied?
- 447.When AC generators operate in parallel and the loading is between 20 and 100% of the rated power, fluctuations of the current value are permitted within the following limits:
- 448.Local control means
- 449.Computer device control must be in one of the following conditions:
- 450.SEMI-AUTO operation condition means which of the following?
- 451.The concept of redundancy means
- 452.The selection of the visualisation of the specific subsystem in the system menu causes which of the following?
- 453.PLC controller of COMPACT type consists of the following blocks:
- 454.Timers, counters, recorders, flags belong to which of the following?
- 455.The simplified operational cycle of the programmer is as follows:
- 456.The following signals are transmitted to the binary input of the controller:
- 457.Analogue outputs of the controller can operate with which of the following actuators:
- 458.ROTARY BURNER In the case of the rotary burner the primary air is used for which of the following?
- 459.BOILER OF THE MAIN POWER UNIT Controller MASTER controls the boiler of the ship mainly based on the signals from the following transducers:
- 460.BOILER OF THE MAIN POWER UNIT Controller MASTER controls which of the following?
- 461.ANCILLARY BOILERS IN TANKERS TRANSPORTING PETROLEUM In two boilers operating in combination with the common main steam line when Master - Slave automatic control option
- 462.ANCILLARY BOILERS The amount of air supplied to the boiler is controlled by which of the following?
- 463.The general use of shipboard insulated networks is primarily due to:
- 464.In shipboard systems, at least the following is required:
- 465.The commonly used in shipboard systems is the following electricity distribution system:
- 466.The emergency source of electrical power shall be located at:
- 467.The protection of generators, which can be checked during normal operation, is as follows::
- 468.When 1 generator unit is operated and a blackout occurs, the generator protection that will disconnect the generator of this unit from the rails is as follows:
- 469.When 2 generating units are operated and one of them stops generating power, the generator protection that disconnects the generator from rails unit is as follows:
- 470.Frequency regulation of the generating unit allows a deviation from the setpoint in the steady state as follows:
- 471.Frequency control of the generating unit allows a deviation from the setpoint in the dynamic state as follows:
- 472.Voltage regulation of the generating unit allows for a deviation below the setpoint in the dynamic state as follows:
- 473.The voltage regulation of the generating unit allows for a deviation from the setpoint in the steady state as follows:
- 474.The generator voltage frequency switched on the GTR rail during synchronization should be:
- 475.For the distribution of the active power in parallel operation of generators, the following is responsible
- 476.For the distribution of reactive power in parallel operation of generators, the following is responsible
- 477.The emergency generator (a generator with an independent drive unit) will be connected to the power system in the event of failure of the basic units after the maximum of:
- 478.The signal for starting the emergency generator shall be:
- 479.A signal to switch on another generating unit associated with reserve power occurs when the load on the working unit
- 480.The distribution of the operating power of two operating generating units shall be equally charged with the accuracy of:
- 481.A shaft rod generator with a thyristor inverter with a fixed trigger angle requires:
- 482.Manual synchronization is usually performed in light bulbs system:
- 483.If, during the parallel operation of the generators, the proper distribution of the active power is "not held", this means that:
- 484.Power generator undervoltage protection is provided:
- 485.The directional protection of the generators is provided:
- 486.Voltage frequency control on the GTR during the operation of the shaft generator with thyristor inverter is realized:
- 487.Voltage control on GTR during operation of the shaft generator with thyristor inverter is realized:
- 488.In computerised shipboard systems, when there is a blackout and the emergency unit, which is powered by an independent drive system, is not connected to the ATR rails, the power supply shall be provided to:
- 489.Voltage distortion in THD systems must not exceed:
- 490.In the ship's computerised systems, after "blackout" has subsided, electrical equipment starts up sequentially, which is related to:
- 491.Mayer's system is the following safety device type for the generator:
- 492.Receivers that are turned off by the Mayer system include:
- 493.In ships where the lighting and other important equipment is supplied by transformers, provision shall be made for at least:
- 494.The rails and uninsulated connections belonging to the different phases shall be marked with the following colours:
- 495.The following must be installed on the main switchboard for each AC generator:
- 496.Ammeters should be used in important circuits when the current of the device exceeds:
- 497.For electrical equipment with a voltage exceeding 1000 V, the insulation resistance shall be:
- 498.The following electricity distribution system may not be used in shipboard installations above 1000V:
- 499.In shipboard installations up to 1000V, the cross-section of the power cable conductor should not be less than:
- 500.The main switchboard rails in networks above 1000 V shall be subdivided into at least: