SeaQuiz

If a severe storm threatens the COASTAL DRILLER while elevated, the setback in the derrick should be lowered and placed in the pipe rack. Its weight should be accounted for as __________.

  1. Avariable loads ✓
  2. Bdrilling loads
  3. Cenvironmental loads
  4. Dfixed weight

Correct answer: A) variable loads

USCG question bank (2008) · Deck Safety – Question Bank Book 4 · pass mark 70%

← PreviousNext →
Take the full practice test: Deck Safety – Question Bank Book 4 →Free USCG practice test with the real pass mark, no sign-up

More questions from this module

Question list: Deck Safety – Question Bank Book 4 (BK4)