While elevated, the COASTAL DRILLER prepares for a severe storm. When the setback is lowered and placed in the pipe racks, it is considered as part of the __________.
- Afixed loads
- Bbasic loads
- Cvariable loads ✓
- Dstorm loads
Correct answer: C) variable loads