In securing deck loads for an ocean tow, drill pipe should be __________.

  1. Agalvanized to protect against corrosion
  2. Bheld in place with heavy materials such as spare pendant wire
  3. Climited to no more than five courses high
  4. Dprovided with bulwarks at both ends of their bays ✓

Correct answer: D) provided with bulwarks at both ends of their bays

USCG question bank (2008) · Deck Safety – Question Bank Book 4 · pass mark 70%