The DEEP DRILLER is loaded as shown in Sample Load Form #4 (Drilling). What would be the new sum of FSML for Fresh Water if the entire contents of Drill Water Tank #5P are transferred to Tank #5S?
- A3,645 ft-tons
- B3,328 ft-tons
- C317 ft-tons ✓
- D0 ft-tons
Correct answer: C) 317 ft-tons