When checking for the presence of sulfite in the feed water of an auxiliary boiler, you are in essence checking __________.
- Athe hardness of the makeup feed water
- Bto ensure the compound additions are adequate for control of pH
- Cto ensure the compound additions are adequate for controlling dissolved oxygen ✓
- Dto ensure the automatic or manual blowdown rate and frequency is adequate for control of total dissolved solids
Correct answer: C) to ensure the compound additions are adequate for controlling dissolved oxygen