SeaQuiz

When purging a refrigeration gage manifold, which of the fittings listed is normally tightened last?

  1. AThe hose fitting at the discharge valve is tightened last after purging the low pressure line.
  2. BThe fittings at the discharge and suction valves of the compressor are both closed simultaneously to prevent objective cross flows.
  3. CThe hose fitting at the suction service valve is tightened last after purging the center connection. ✓
  4. DThe low pressure hose fitting at the gage manifold is the only fitting that is connected first and tightened last.

Correct answer: C) The hose fitting at the suction service valve is tightened last after purging the center connection.

USCG question bank (2008) · Engineering General Subjects – Question Bank Book 11 · pass mark 70%

← PreviousNext →
Take the full practice test: Engineering General Subjects – Question Bank Book 11 →Free USCG practice test with the real pass mark, no sign-up

More questions from this module

Question list: Engineering General Subjects – Question Bank Book 11 (BK11)