As soon as all of the pulverized material has been discharged from a P-tank, the tank should be __________.
- Avented and depressurized
- Brepressurized and blown out with the discharge hoses disconnected ✓
- Crepressurize and blown out with the discharge hoses connected
- Dallowed to stand empty, but pressurized until refilled
Correct answer: B) repressurized and blown out with the discharge hoses disconnected