SeaQuiz

As soon as all of the pulverized material has been discharged from a P-tank, the tank should be __________.

  1. Avented and depressurized
  2. Brepressurized and blown out with the discharge hoses disconnected ✓
  3. Crepressurize and blown out with the discharge hoses connected
  4. Dallowed to stand empty, but pressurized until refilled

Correct answer: B) repressurized and blown out with the discharge hoses disconnected

USCG question bank (2008) · Engineering General Subjects – Question Bank Book 11 · pass mark 70%

← PreviousNext →
Take the full practice test: Engineering General Subjects – Question Bank Book 11 →Free USCG practice test with the real pass mark, no sign-up

More questions from this module

Question list: Engineering General Subjects – Question Bank Book 11 (BK11)