It is necessary to replace a branch suction section of bilge system piping within the machinery space. The machinery space is 100' in length and 85' in breadth. The molded depth of the bulkhead deck is 25'. Which of the listed pipe sizes should be used?

  1. A2" (nominal size) schedule 40
  2. B3" (nominal size) schedule 80
  3. C4" (nominal size) schedule 80 ✓
  4. D5" (nominal size) schedule 60

Correct answer: C) 4" (nominal size) schedule 80

USCG question bank (2008) · Engineering General Subjects – Question Bank Book 11 · pass mark 70%