SeaQuiz

When you adjust a thermostatic expansion valve __________.

  1. Arefrigerant must be bled off the sensing line before adjustments are made
  2. Ball refrigerant must be pumped into the receiver before adjustments are made
  3. Ctime must be allowed for conditions to stabilize in the evaporator before further adjustments are made ✓
  4. Dall refrigerant must be routed through the dehydrator while changing the superheat setting

Correct answer: C) time must be allowed for conditions to stabilize in the evaporator before further adjustments are made

USCG question bank (2008) · Engineering General Subjects – Question Bank Book 11 · pass mark 70%

← PreviousNext →
Take the full practice test: Engineering General Subjects – Question Bank Book 11 →Free USCG practice test with the real pass mark, no sign-up

More questions from this module

Question list: Engineering General Subjects – Question Bank Book 11 (BK11)