Due to inspection or repair, the boiler must be emptied. If we have enough time, how will we conduct this operation?
- ALet the boiler cool down without doing anything. Then we pump out the boiler water. ✓
- BWe unload the boiler by forcing the safety valves to open and perform the operation.
- CWe empty the boiler by performing a lower and upper blow down.
- DBypass the level regulator, fill in with boiler water up, and then empty it.
Correct answer: A) Let the boiler cool down without doing anything. Then we pump out the boiler water.