During the preparation for the operation of the turbine system, the engineer of the watch must record in the engine log book:
- ATime of the main operations.
- BThe results of the checks and measurements carried out.
- CAll orders from the bridge and orders from the chief engineer.
- DAll listed ✓
Correct answer: D) All listed