What is the purpose of introducing a delay in operation of the generator circuit breaker when a short circuit occurs?

  1. ADelay in operation of the generator circuit breaker in the event of a short circuit is not foreseen.
  2. BThe delay is introduced to prevent false protection trips.
  3. CA delay is needed when time selectivity is expected. ✓
  4. DThe delay is necessary to combine the operation of the short-circuit protection with the Mayer protection (non-essential trip).

Correct answer: C) A delay is needed when time selectivity is expected.