Which of the methods for warming up the turbine is carried out as a priority in marine steam turbines?
- AWith a permanent steam pipe system for heating the turbine during rotation and with the help of the turning gear.
- BHeating of the turbine when rotating the rotors with working steam at standstill.
- CCombined-at first with low-pressure working steam and turning with the turning gear, then only with working steam.
- DEach one can be applied as a primary. ✓
Correct answer: D) Each one can be applied as a primary.