Which of the methods for warming up the turbine is carried out as a priority in marine steam turbines?

  1. AWith a permanent steam pipe system for heating the turbine during rotation and with the help of the turning gear.
  2. BHeating of the turbine when rotating the rotors with working steam at standstill.
  3. CCombined-at first with low-pressure working steam and turning with the turning gear, then only with working steam.
  4. DEach one can be applied as a primary. ✓

Correct answer: D) Each one can be applied as a primary.