SeaQuiz

Which preventive action should we take as a priority before starting the turbine warm-up?

  1. ATurn on the turnuing gear and check the oil level and the operation of the oil system.
  2. BMake an entry about the operation in the logbook.
  3. CTo check the operation of the instrument panel and turbine automation, thouroughly check the emergency signaling.
  4. DTo carry out preliminary measurements and compare them with those of the manufacturer. ✓

Correct answer: D) To carry out preliminary measurements and compare them with those of the manufacturer.

← PreviousNext →
Take the full test: F6 Maintenance and Repair — Management Level →Random exam test generator, free, no registration

More questions from this test

Question list: F6 Maintenance and Repair — Management Level