If at 75% load of two generators running in parallel, one of them shuts down, what emergency action will we take?
- ADisconnect of all non-essential consumers from the buses of the main switchboard. ✓
- BStart and turn on emergency generator.
- CRestart the disconnected generator.
- DCheck the main circuit breaker of the disconnected generator.
Correct answer: A) Disconnect of all non-essential consumers from the buses of the main switchboard.