When calibrating the meter, what is usually the first step?

  1. ALinearity setting and the range.
  2. BSetting the zero point and the range. ✓
  3. CSetting the range and amplitude.
  4. DSetting the range and zero point.

Correct answer: B) Setting the zero point and the range.