Before measuring insulation with a megohmmeter, the windings of large electrical machines should be grounded for about 15 minutes before the start of the measurement because:

  1. AIt is possible to damage the insulation.
  2. BIt is possible that the insulation is wet.
  3. CThe armature windings will have a number of leakages.
  4. DLarge machines can potentially build up static electricity. ✓

Correct answer: D) Large machines can potentially build up static electricity.