While the DEEP DRILLER is loaded as shown in Sample Form #4 (Drilling), casing is accidentally dropped over the starboard side. Because the sounding level and starboard inclination are rapidly increasing, you decide that tank 1S is damaged. Your best countermeasure is to __________.
- Adeballast from tank 2S ✓
- Bdump the mud
- Ccounterflood into 9P
- Dplace a wooden plug into the vent of tank 2S
Correct answer: A) deballast from tank 2S