You should consider placing the drilling operations of the DEEP DRILLER in standby when __________.
- Asustained winds exceed 50 knots ✓
- Bwinds exceed 70 knots
- Ccritical motion limits have been exceeded
- Dwaves are greater than 64 feet
Correct answer: A) sustained winds exceed 50 knots