SeaQuiz

The DEEP DRILLER is loaded as shown in Sample Load Form #4, (Drilling). In preparing for approaching heavy weather, the four leeward mooring lines are slacked. These actions reduce the __________.

  1. Anatural pitch period ✓
  2. Bmetacentric height
  3. Cheight of the righting arm
  4. Drighting moment

Correct answer: A) natural pitch period

USCG question bank (2008) · Deck Safety – Question Bank Book 4 · pass mark 70%

← PreviousNext →
Take the full practice test: Deck Safety – Question Bank Book 4 →Free USCG practice test with the real pass mark, no sign-up

More questions from this module

Question list: Deck Safety – Question Bank Book 4 (BK4)