When would a jack-up drilling rig be considered "underway" under the International Rules of the Road?

  1. AWhen it is being towed to a new location ✓
  2. BWhen it is elevated and taking on preload
  3. CWhen it is elevated and engaged in drilling
  4. DWhen it is moored to a dock in the shipyard

Correct answer: A) When it is being towed to a new location