SeaQuiz

During a move to a new location, a jack-up drilling unit with personnel on board is towed through a heavy rainstorm. What signal must be sounded by the drilling rig when visibility is restricted?

  1. AOne prolonged blast
  2. BTwo prolonged blasts
  3. COne prolonged and two short blasts
  4. DOne prolonged and three short blasts ✓

Correct answer: D) One prolonged and three short blasts

USCG question bank (2008) · Deck Safety – Question Bank Book 4 · pass mark 70%

← PreviousNext →
Take the full practice test: Deck Safety – Question Bank Book 4 →Free USCG practice test with the real pass mark, no sign-up

More questions from this module

Question list: Deck Safety – Question Bank Book 4 (BK4)