SeaQuiz

If control air systems are supplied from starting air receivers, the capacity of the receivers should be sufficient __________.

  1. Ato provide for intermittent starting procedures
  2. Bfor continued operation of these systems after capacity for the required number of consecutive starts has been used ✓
  3. Cto provide a nonreversible engine a minimum of twelve consecutive starts
  4. Dto enable six consecutive starts of a reversible engine

Correct answer: B) for continued operation of these systems after capacity for the required number of consecutive starts has been used

USCG question bank (2008) · Motor Plants and Auxiliary Boilers – Question Bank Book 14 · pass mark 70%

← PreviousNext →
Take the full practice test: Motor Plants and Auxiliary Boilers – Question Bank Book 14 →Free USCG practice test with the real pass mark, no sign-up

More questions from this module

Question list: Motor Plants and Auxiliary Boilers – Question Bank Book 14 (BK14)