Coast Guard Regulations (46 CFR) require the programming control sequence for auxiliary boiler operation to include __________.
- Apre-purge period for one complete change of air
- Bignition period to ignite the fuel 4 seconds after fuel delivery
- Cnot to automatically increase the air flow after a safety trip ✓
- Dall of the above
Correct answer: C) not to automatically increase the air flow after a safety trip