Coast Guard Regulations (46 CFR) require the programming control sequence for auxiliary boiler operation to include __________.

  1. Apre-purge period for one complete change of air
  2. Bignition period to ignite the fuel 4 seconds after fuel delivery
  3. Cnot to automatically increase the air flow after a safety trip ✓
  4. Dall of the above

Correct answer: C) not to automatically increase the air flow after a safety trip

USCG question bank (2008) · Motor Plants and Auxiliary Boilers – Question Bank Book 14 · pass mark 70%