SeaQuiz

Which of the following is necessary for all waste heat boiler installations, regardless of design or manufacturer?

  1. AA means to control of evaporation ✓
  2. BAn independent means to prevent feed water contamination
  3. CInstallation of a deareating feed water heater
  4. DInstallation of a superheater

Correct answer: A) A means to control of evaporation

USCG question bank (2008) · Motor Plants and Auxiliary Boilers – Question Bank Book 14 · pass mark 70%

← PreviousNext →
Take the full practice test: Motor Plants and Auxiliary Boilers – Question Bank Book 14 →Free USCG practice test with the real pass mark, no sign-up

More questions from this module

Question list: Motor Plants and Auxiliary Boilers – Question Bank Book 14 (BK14)