Prior to relieving the watch you should first check the fire room status by verifying the boiler water level and ___________.
- Aprepare to blow tubes
- Beconomizer inlet temperature
- Cboiler steam pressure ✓
- Dport and starboard settling tanks
Correct answer: C) boiler steam pressure