SeaQuiz

Prior to relieving the watch you should first check the fire room status by verifying the boiler water level and ___________.

  1. Aprepare to blow tubes
  2. Beconomizer inlet temperature
  3. Cboiler steam pressure ✓
  4. Dport and starboard settling tanks

Correct answer: C) boiler steam pressure

USCG question bank (2008) · Steam Plants – Question Bank Book 13 · pass mark 70%

← PreviousNext →
Take the full practice test: Steam Plants – Question Bank Book 13 →Free USCG practice test with the real pass mark, no sign-up

More questions from this module

Question list: Steam Plants – Question Bank Book 13 (BK13)