Coast Guard Regulations (46 CFR) for boiler fuel oil service systems, require that __________.

  1. Adischarge piping from the service pumps to the burners must be of schedule 60 seamless steel
  2. Bthe return line from the burners must be arranged so that suction piping cannot be subject to discharge pressure ✓
  3. Cthe fuel oil service pump relief valve must discharge to a wing tank
  4. Dthe suction strainer must be a simplex type

Correct answer: B) the return line from the burners must be arranged so that suction piping cannot be subject to discharge pressure

USCG question bank (2008) · Steam Plants – Question Bank Book 13 · pass mark 70%