According to Coast Guard Regulations (46 CFR), a 1200 psig maximum allowable working pressure boiler, with external blowoff piping is required to have the blowoff piping withstand a minimum of __________.
- A1200 psig
- B1425 psig ✓
- C1500 psig
- D1575 psig
Correct answer: B) 1425 psig