If an alternator is to be inactive for a considerable period of time, which of the following actions should be taken?

  1. AIt should be disconnected from the prime mover and raised off its bearing supports.
  2. BInsulation resistance readings should be taken weekly to ensure resistance is not deteriorating.
  3. CThe brushes should be lifted off the slip rings to prevent pitting of the metal by electrolytic action. ✓
  4. DThe windings and collector rings should be protected with a thin coat of grease or oil.

Correct answer: C) The brushes should be lifted off the slip rings to prevent pitting of the metal by electrolytic action.

USCG question bank (2008) · Electricity – Question Bank Book 12 · pass mark 70%