If deck machinery is expected to be idle for an extended period of time you should____________.

  1. Ahave electrical safety gloves available in case of electrical shock before running
  2. Bperform a 'high pot' test to determine the condition of the insulation
  3. Cwater wash the motor and controller to remove any salt that may interfere with smooth operation
  4. Dcheck run at regular intervals to insure correct operation and to renew the internal coating of lubrication ✓

Correct answer: D) check run at regular intervals to insure correct operation and to renew the internal coating of lubrication