When replacing a defective transformer in a paralleled transformer configuration, which of the following actions must be carried out to insure proper operation of the equipment it serves?

  1. AThe secondary leads must be grounded for 10 minutes to remove static charges.
  2. BThe transformer connections must be made as before with regard to the indicated polarity. ✓
  3. CThe iron core of the transformer must be flashed to pre-magnetize it.
  4. DThe iron core must be grounded for 10 minutes to remove any residual magnetism.

Correct answer: B) The transformer connections must be made as before with regard to the indicated polarity.

USCG question bank (2008) · Electricity – Question Bank Book 12 · pass mark 70%