When shore power is being connected to a ship in dry dock, __________.

  1. Athe ship's generators are paralleled with the shore power to provide continuous power
  2. Bproper phase sequence must be established ✓
  3. Cexactly 450 volts must be supplied from the shore
  4. Dexactly 60 Hz must be provided by the terminal

Correct answer: B) proper phase sequence must be established