Before testing insulation with a megohmmeter, the windings of large machines should be grounded for about 15 minutes just prior to the test, because the __________.

  1. Astatic charge of the machine may give a false reading ✓
  2. Barmature will have a greater number of leakage paths
  3. Cinsulation may be damaged
  4. Dinsulation may be covered with moisture

Correct answer: A) static charge of the machine may give a false reading