In preparing to take insulation resistance readings on a main generator, the windings should be grounded for about 15 minutes prior to the test to __________.
- Aallow accurate zeroing of the meter
- Bhelp the windings to cool to ambient temperature
- Crelease any residual capacitive charge from the windings ✓
- Dhelp the windings to cool to the same temperature as the ground test connection
Correct answer: C) release any residual capacitive charge from the windings