When securing a distillate pump on a low pressure fresh water evaporator, which of the listed steps should be carried out FIRST?
- AStop the pump.
- BClose the pressure gage valves.
- CTrip the three-way solenoid dump valve. ✓
- DClose the sealing line valves to the pump.
Correct answer: C) Trip the three-way solenoid dump valve.