SeaQuiz

As routine maintenance, the bilge manifold valves are periodically removed and examined. Prior to re-securing the valve bonnets, the valve __________.

  1. Adisks and seats should be checked and lapped if necessary
  2. Bbonnet flange gaskets should be renewed if they were cut or torn
  3. Cstem packing should be renewed if the packing has hardened
  4. Dall of the above ✓

Correct answer: D) all of the above

USCG question bank (2008) · Engineering General Subjects – Question Bank Book 11 · pass mark 70%

← PreviousNext →
Take the full practice test: Engineering General Subjects – Question Bank Book 11 →Free USCG practice test with the real pass mark, no sign-up

More questions from this module

Question list: Engineering General Subjects – Question Bank Book 11 (BK11)