When new piping sections have been fabricated for installation in a hydraulic system, prior to installation the piping should be __________.
- Acleaned using a water-based detergent
- Bdescaled by using a pickling solution ✓
- Chydrostatically tested to 100% of maximum working pressure
- Dall of the above
Correct answer: B) descaled by using a pickling solution