Bilge suction lines led through tanks, without using a pipe tunnel, must be __________.

  1. Afabricated of schedule 80 pipe ✓
  2. Bfitted with gate valves at the bilge manifolds
  3. Ccoated with coal tar epoxy, or similar corrosion resistant substance
  4. Dfitted so as to not allow for expansion

Correct answer: A) fabricated of schedule 80 pipe

USCG question bank (2008) · Engineering General Subjects – Question Bank Book 11 · pass mark 70%