Coast Guard Regulations (46 CFR Part 56) for bilge and ballast piping require that __________.
- Aall oil and water tanks be connected to the bilge system
- Bthe bilge pumping system be operable under all practicable conditions ✓
- Cpeak tanks and chain lockers have separate electric pumps
- Dall of the above
Correct answer: B) the bilge pumping system be operable under all practicable conditions