The pump packing gland has been repeatedly tightened by small increments until the gland has bottomed. Which of the actions listed should be carried out next if the leakage continues to be excessive?
- AReplace all of the packing.
- BReplace with larger cross-sectional turns of packing.
- CReplace the soft packing with packing turns that are covered with lead wrap.
- DContinue to add more turns of packing. ✓
Correct answer: D) Continue to add more turns of packing.