SeaQuiz

P-tank dry bulk material discharge hoses must be connected __________.

  1. Aafter admitting compressed air to the P-tank
  2. Bbefore admitting compressed air to the P-tank ✓
  3. Cafter opening the jet air
  4. Dbefore the P-tank is loaded

Correct answer: B) before admitting compressed air to the P-tank

USCG question bank (2008) · Engineering General Subjects – Question Bank Book 11 · pass mark 70%

← PreviousNext →
Take the full practice test: Engineering General Subjects – Question Bank Book 11 →Free USCG practice test with the real pass mark, no sign-up

More questions from this module

Question list: Engineering General Subjects – Question Bank Book 11 (BK11)