SeaQuiz

You discover an air leak at the manhole cover shortly after pressurizing a P-tank. You must __________.

  1. Areduce the P-tank pressure to 25-30 psi to complete the dry material transfer
  2. Bincrease the P-tank pressure to the unloading valve setting to force the manhole cover to seat itself
  3. Ccomplete the dry material discharge before attempting any repairs
  4. Ddepressurize the tank, replace the gasket, then tighten the bolts securing the hatch cover ✓

Correct answer: D) depressurize the tank, replace the gasket, then tighten the bolts securing the hatch cover

USCG question bank (2008) · Engineering General Subjects – Question Bank Book 11 · pass mark 70%

← PreviousNext →